Get backup quotes

Backup systems & services · BK-05

Keep trading when the grid drops

Free quotes from commercial backup installers and electrical contractors across South Africa. One request, no obligation.

Three grey inverters above a tall rack of battery modules in a warehouse plant room, with yellow cable trays overhead
Business Backup PowerRating label · BK-05
Suits
Tills, servers, cold rooms, pumps, alarms
How it works
Critical loads on a 3 phase or split system
Size
Tens of kWh banks, 3 phase inverters
Check first
CoC needed; generator interlock checked
Time
Site survey first; fitted over several days

Backup power for business is a different job from a house. Loads are bigger, often 3 phase, and some of them cannot stop: tills and card machines, server rooms, medicine fridges, cold rooms, borehole pumps and alarm systems. This page covers how installers approach backup power solutions for business, from a corner shop to a factory: critical loads, 3 phase inverters, larger battery banks, a generator alongside, and maintenance contracts. Send one free, no-obligation request and local installers and electrical contractors quote you directly for your site.

Start with the critical loads

Very few businesses back up everything. A site survey sorts the loads into three groups:

  • critical: must never drop, such as servers, the network, card machines, tills, alarms, medicine fridges and emergency lighting
  • important: should run during an outage, such as office lights, a cold room, a borehole pump or the reception area
  • deferrable: can wait for the grid, such as aircons, kitchens, ovens, compressors and heavy plant

The critical group sets the minimum system, and each step up adds cost. Ask installers to show you the load figures behind their sizing.

3 phase and bigger banks

Most factories, workshops and farms with motors have a 3 phase supply, and many shops do too. A backup power system for them uses a 3 phase hybrid inverter or several units working together, with battery banks of tens of kWh in a rack or cabinet. 3 phase hybrid inverters alone sell for about R38,000 to R65,000; complete business systems are quoted per site, because the cabling, switchgear and battery size vary so much. Ask about battery room ventilation, fire safety and access control, and keep the bank locked: battery theft from business premises happens.

Server rooms and cold rooms

Battery backup for a server room is usually two layers: an online UPS in the rack that never lets the servers see a break, and the main backup system or a generator behind it for longer outages. Remember the cooling: servers kept running in a hot room will shut themselves down anyway. Cold rooms and freezers draw a large surge when the compressor starts, so the inverter needs headroom, and a well-sealed cold room can often ride out a short outage on its own. For computers alone, see UPS for computers and servers.

Generators alongside, and maintenance

For long outages, many sites pair a battery system with a diesel generator. The battery covers the switch-over and short gaps silently; the generator starts for long ones and recharges the bank. Ask how the two are interlocked so they cannot feed each other or the grid. A maintenance contract is worth pricing too: firmware updates, battery health checks, cleaning fans and filters, testing the changeover and checking connections for heat. Ask what is included, in writing, and how fast a technician responds to a fault.

What to include in your request

  • Say the type of business and the supply
  • List the critical loads and their hours
  • Mention any generator already on site
  • Say where a battery room could go
  • Ask for maintenance options in writing

Business Backup Power for different clients

  • Homeowners: a home business or guesthouse needing more than a standard house backup package
  • Complexes, estates and body corporates: estate gatehouse, booms, borehole pumps and clubhouse on one managed backup system
  • Offices and home offices: servers, network, phones and workstations on a UPS backed by a battery system
  • Shops, restaurants and salons: tills, card machines, lights, display fridges and the alarm kept running through outages
  • Farms and smallholdings: borehole and irrigation pumps, cold rooms and electric fences on 3 phase backup
  • Clinics, surgeries and care homes: clinics and pharmacies keeping medicine fridges, computers and lights on without a break
  • Factories, warehouses, schools and churches: control circuits, offices and selected machines on 3 phase banks with a generator
  • Electricians, installers and security companies: electrical contractors pricing commercial systems, generator interlocks and maintenance for business clients

Frequently asked questions

What are the best backup power solutions for business?
It depends on the critical loads and how long outages last. Offices and practices often do well with a hybrid inverter and lithium bank, plus a UPS in the server rack. Shops with fridges need surge headroom. Factories and farms often combine a 3 phase battery system with a generator. A site survey is the only honest way to choose.
Do I need a 3 phase backup system?
If your supply is 3 phase and the loads you want to back up include 3 phase motors, pumps or machines, yes. If only single phase loads such as lights, tills and computers need backup, those circuits can sometimes be backed up on their own. An electrician can check the supply at the DB board and the loads on each phase.
How much does business backup power cost?
3 phase hybrid inverters alone sell for about R38,000 to R65,000. Complete business systems are quoted per site, because battery size, switchgear, cable runs, a generator interlock and the installation all change the total. Ask each installer for an itemised quote so you can compare the inverter, batteries, labour and CoC side by side.
Who will quote for my business site?
Send one free request with the type of business, the supply, the critical loads and the hours needed. We pass it to independent installers, electrical contractors and UPS dealers who work in your area, and they quote you directly. We are a request service only, so you choose who visits and whose quote to accept.

Business Backup Power by province and city

More backup power, batteries and UPS

Free quote request

Request business backup power quotes

Plan it the way an installer would on a site visit: switch on what must keep running and for how long, or describe the system and the job, and say how to reach you. Installers, electricians and suppliers who work in your area quote you directly.

Backup plan & quote requestFREE · NO OBLIGATION · BK-05 · 3 phase
Nº 071622

01The job

02What must keep running (optional, it helps the quote)

Switch on what must keep running when the power goes
6 h

CHARGE METER · WHAT IT TAKES

Running
-
Energy
-
Suggests
-
Estimate
-

A rule of thumb from published prices, not a quote.

03When

04Request list (optional)

  1. 01
  2. 02
Up to 12 lines: inverters, batteries, UPS units, lights or work.
Needs and options

05Your details

Free and no obligation. By sending you agree that we may share your request with suitable installers, electricians and suppliers. See our privacy policy.

Get free battery backup quotes